Heating plant in Lehtiniemi
Customer: Paraisten Kaukolämpö Oy
Years: 2009 – 2014
2009 – 2010 planning and design of new heating plant
• main designs, tendering and supervision during construction
• location in town of Pargas
• capacity of 8 MW
• wood chips as fuel source
2012 – 2014 planning and design of addition to heating plant
The addition was carried out by building a new heating plant adjacent to the existing one with a 4 MW biomass boiler and 4 MW peak-load boiler.
• main designs, tendering and supervision during construction
• additional capacity from 4 MW biomass boiler and 4 MW light fuel oil peak-load boiler
• wood chips as main fuel source and light fuel oil as reserve fuel
Our services included
- energy investment grant application
- environmental registration application
- building permit application
- application for the placement of pressure equipment
- tender documentation and contracts as subcontracts
- contract negotiations
- supervision during construction and hand-over inspection
- building safety and emergency plans
- drawing up of ATEX documentation